estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。 - Cost estimations for various schemes do not include preliminary items and the caisson units.
每个方案的估价不包括开办费用和海堤沉箱的价钱。 - No plans, no estimations, no iterations, no overhead – There is no silver bullet and no alternative to hard work, discipline, target on perfection and constant improvements.
没有计划、没有估算、没有迭代、没有管理开销&从来不存在银弹,而且除了努力工作、纪律、追求完美和持续改进之外,别无他法。 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - The estimated results of the slopes are introduced into the EKF to get state estimations without radome interference which generates the guidance law command.
将斜率估计结果代入EKF,得到滤除天线罩误差影响的系统状态量估计结果并形成制导指令。 - Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
基于MCMC的多维相关系数平稳序列 - Estimations for Two-parametered Exponential Distribution under Censored and Missing Data
截尾缺失数据下双参数指数分布的参数估计 - The U-tube method is recognized as a standard for industrial routine estimations.
U形管方法被公认为日常工业鉴定的标准方法。 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。 - This reduction in uncertainty also reduces the variance in estimations, since there is a direct correlation between these factors and the ability to produce sound estimates.
这种不确定性的削减还减少了估计中的变化,因为在这些因素和生成可靠估值的能力之间存在直接的关联。